MamaSays

Posts By : SisterMAmaLo23-ver

Earth Block Compressed Interlocking Soil Stabilized Enviro-Bricks are Fireproof

Earth Block Compressed Interlocking Soil Stabilized Enviro-Bricks are Fireproof, Waterproof, Insect Proof, Sound Proof, Hurricane and Earthquake Resistant Utilizing Recycled Stabilized

Soil Earth Block Green Home Construction Technologies

Energy Efficient, Environmentally Friendly, Mother Nature Built, Sustainable Construction

Environmentally Friendly Enviro-Bricks and Earth-Brick Homes are your affordable option. The American dream of a brand new custom home is now within reach for the average home buyer. If you would like to have a home built, please consider our recyled environmental “Green” homes. As we enter the 21st century we are at the dawn of a New Environmental Revolution. Our mission is crystal clear: preserve our environment; mass recycling; reducing deforestation; energy conservation and ending pollution of our planet. Through a focused grass roots effort of word of mouth education, we can all help Mother Earth more effectively than has been done to date.

There are many environmentally focused businesses in the world, but few that offer what Enviro-Bricks does. With a totally recycled building system, “Green” has never been “Enviro-Brick Green”. One of the most severe situations in the world is affordable housing. Sadly, this is a worldwide problem and the U.S. is no exception in having an economical solution. Enviro-Bricks has the most advanced solution yet!

It was recently reported that only three in ten families can afford to live in California. This same sad scenario is true across the country, so what is the answer? Enviro-Bricks are an economical solution as we use low cost mobile manufacturing units which recycle fly ash and wood waste along with stabilized soil and convert it into a superior building brick called Enviro-Bricks. We also manufacture hardscape earth bricks for walls, landscaping, sound abatement and fire wall protection.

As most of us realize, the lowest mortgage rates in over forty years has helped, but it is not the only answer witnessed by the current low affordability factors nationwide. Most people are living paycheck to paycheck with little or nothing left at the end of a month to go towards saving for a down payment on a home. With the additional factor of new home prices rising up to 30% or more last year in some areas, what is a family to do?

We are an Environmental Construction Solutions Technologies company specializing in low cost road remediation and residential and commercial construction utilizing our low cost high quality Enviro-Bricks construction system. With millions of miles of roads crumbling in disrepair, combined with the need for affordable housing due to the ever increasing costs of cement and lumber, ECTS has the answer. Lumber prices have more than doubled in the past six months, so the need for affordable alternatives is growing daily.

Imagine converting any dirt road into a superior strength road surface at a fraction of the cost of cement or asphalt? Imagine recycling fly ash into new roads with our RP soil stabilization which will save millions on road remediation and construction for every municipality in every state nationwide? Combined with our breakthrough in recycled building and construction bricks that look like high quality fired bricks, we have the only viable environmental and economical solution available.

Imagine a superior low cost home that is fire, water, insect, sound, mold and can be certified hurricane proof. With our exclusive interlocking brick design feature we are also able to meet or exceed earthquake certifications. Combined with our superior R-value and cost saving construction system, why would anyone want to build with an inferior wood stick and frame system? Once you live in a home constructed of solid brick or stone, there is no comparison.

With all these Enviro-Brick advantages, plus energy savings of up to 50% on heating and cooling, lower insurance costs with a fireproof and waterproof home, your overall savings can be significant. If these are not enough reasons to consider building with Enviro-Bricks, then think about stopping deforestation and cement manufacturing pollution worldwide. When you consider a “Green” home, why spend up to 20% more when you can save your hard earned “Green” with ECT.

The Principal Facts on The “R” Factor of Insulation as Applied in Earthen Construction Utilizing Compressed Stabilised Earth-Bricks as Energy Efficient Alternative

It has long been a documented that Adobe is a very good insulator in the form of housing bricks, this however is not in the technical sense of the word insulation. The actual insulating value of any material is based on the resistance to the transmission of heat or cold applied to one side of the wall to the other side. Heat always moves to cold, hence, mass has an impact on this rating system, but there is no factor used to calculate mass ratings and variables.

On the other hand, earth walls have a good heat storage capacity, which means when warm, they will stay warm for a considerable length of time. This is called the “flywheel” effect. In a real building application the interior temperature will usually be at an average of the high and low temperatures outside from several days earlier. This is termed the “thermal lag” effect. While the outdoor temperature may vary from 30NF to 40NF in a 24 hour period, the inside changes will vary only a few degrees. Thus, the temperature might be 90NF in the day and 60NF at night for several days. The inside of the buildings will approximate the average temperature of 75NF. This feels cool compared to the daytime 90NF. and warm to the night time 60NF. The comfort factor is high because this dampens the wide variations in the exterior temperatures.

As you can see, there is far more that can and does impact insulation factors other than just the R-Value. Unfortunately, there are no standardized tests to establish thermal mass factors to date, so one must understand this before they choose a material for their home solely on R-Values. Many factors must be considered, and one is the above average mean temperature from night to day. In extremes, this will be a major factor, in the above example it will indicate the value of mass.

As the material used in the manufacturing of Enviro-Bricks is variable depending on where, and what plans the bricks will be used for, the R-Value will be customized to areas needs and/or the codes. We use fly ash and cenospheres in combination with soils which produces a rather high insulation factor due to the fact that fly ash is a very fine particle size and fills the voids around soil to produce a very high density brick when compressed. Cenespheres are essentially ceramic vacuum air filled bubbles. As a vacuum is the best insulator, we can achieve very high R-Values, and combined with mass, and density, there is little concern about lack of insulation. We have also added sawdust to also raise the R-Value when available in place of, or in combination with our cenosphere additive. When you have high density using unlike materials of different thermal qualities, this reduces the thermal transfer time, which thereby equates to better energy efficiency. We also use cenospheres mixed with paint when additional insulation values are required under extremes.

The industry is finally accepting the influence thermal mass factor has on the R-Value, so we will soon see a new rating system, which will factor in these new scientific findings. It is my opinion that we will soon see a new rating system, which will prove that thermal mass is as important, if not more important than then R-Values. Earthen construction has higher thermal factors, and less insulation value, while stick and frame has no thermal value and a higher R-Value. It has been clearly demonstrated that the energy efficiency factors are similar with both building construction methods given the same weather factors and test conditions.

Automatic line for manufacturing of foam concrete blocks

Automatic line for manufacturing of foam concrete blocks of not-cured solidification ÏÁÇ-120À

Brief characteristics

The full output – up to 120 ì3 of aerated concrete mixes a day.
Finished product – walling and laster blocks with average density mark D500-D700 with compressive resistance Â1,5-Â2,5 (GOST 21520-89). Dimension of the block in a standard complete set is 188?300?588. Installation of other dimensions is possible.
Massif volume – 0.85 ì3
Time of one massif filling – about 11 minutes.
Release time of massif until cutting – 4-8 hours.
Release time of the cut massif before packing – 8-16 hours.
Warehouse stock of cement – 50 t.
Warehouse stock of filling – 50 t.
The established capacity of the equipment – 20 kW + 45 kW water heating.
Consumption of water – 30t of water a day.
Consumption of air – 2500 l/hour.
Maintenance staff – 6 person (without a warehouse site).
Conditions of allocation – premises of workshop type at absence of an atmospheric precipitation and temperature not less than +5° C.
Raw material

Portland cement – in accordance with GOST 10178 (not containing additives of Tripoli powder, trass, loam, molding boxes, ashes), the recommended brand – ÏÖ 500 Ä0, application of Portland blast-furnance cement ØÏÖ 500 and ØÏÖ 400 after additional testing is possible.
Siliceous components:
– Ashes ablation of cogeneration plant containing Si O2 not less than 45 %, ÑaO not more than 10 %, R2O not more than 3 %, SO3 not more than 3 %;
– Granulated blast-furnace slag – GOST 3476 – it is required a grinding up to a specific surface depending on the required average density.
It is allowed to apply eliminations from crushing the nonmetallic materials, providing reception of foam concrete with set physicotechnical characteristics.
– Sand – in accordance with GOST 8736, containing SiO2 not less than 90 % or quartz not less than 75 %, mica no more than 0,5 %, oozy and argillaceous admixture not more than 3 %.
The base complete set of line ÏÁÇ – 120À is not designed for use of sand. For manufacturing of foam concrete with sand as filling, it is necessary to carry out consultations of experts of Limited Company “IIC” about delivery of the additional equipment.
Water in accordance with GOST 23732.
Besides chemical agents are applied to acceleration the structurization of plastic durability, solidification, etc., and also foam former manufactured by Limited Company “IIC”.

The description of technological process

Preparation and warehousing of raw material
Cement and milled inert filling from cement carriers with compressor installation are loaded into silos. The silo of cement and the silo of filling are located in immediate proximity from ÄÑÊ (dosing unit amalgamator of components).
From silos cement and filling move to dosing units bunkers by means of horizontal or combined screw conveyors. Dosing of dry and liquid components is carried out by means of the industrial processor.
Water through the system of pipelines is filled in special tanks ÑÄÆÊ-3Ï before the shift beginning. In a tank for foam former aperture the concentrate of foam former, and in a tank for chemical agents necessary reagents are added. Liquid components (the concrete chemical agents) are mixed up, lead up to the set temperature and under the program are dosed out in the amalgamator. Thus the concentrate of foam former automatically mixes up with air in special foam generator up to the set frequency rate and as technological foam moves into the amalgamator. For maintenance of productivity and economy of the electric power it is recommended to fill in ÑÄÆÊ – 3Ï with warm water (not below 10-12° Ñ).

Mixing of components
Mixing of all dry and liquid components occurs in several stages. On the central control panel the factory makes the control, processing and management of all important functions of installation over all sites of preparation of aerated concrete mixes. The operator in the real time mode of traces all processes of operation of installation. In case of need the operator in a short period of time can correct or change the current structure, time of mixing, a temperature mode and other technological parameters on the electronic panel of the main board or by means of a computer. Also the operator can transfer the operation of installation in semi-automatic or manual control mode.

Formation, cutting, transportation
The ready mix through the bottom mouth of the amalgamator is unloaded into the metal form. The form of a file will consist of two parts – the pallet and a demountable curb. The pallet represents the carriage on four steel wheels with the wooden basis projecting above a metal skeleton. The demountable curb will consist of two parts the “ã” -shaped form and in assembled state forms four sides, forming the massif. Before filling with aerated concrete mixes, the demountable curb is assembled, lubricated with a special solution or laid by an oiled paper and put on the pallet. For maintenance of tightness, joints of the form are glued by a special sealant. In order to prevent damages during transportation, the sealant is delivered separately from forms and pasted by the Customer.
After filling with aerated concrete mix, the form by means of the positional conveyor, is delivered to a place of ensembling of stripping strength. Time of ensembling of stripping strength depends on many factors (concrete structure, brand of cement, temperature, etc.) and changes from 4 up to 8 hours.
For maintenance of highly strengthening characteristics of a material it is very important to provide a rigid temperature mode at the moment of strength ensembling. Depending on used materials it is necessary to maintain temperature of 40-50° C the section before massif cutting (4-8 hours) and 60-90° C the section after massif cutting (up to 16 hours). More exact temperature schedule is established by the Customer in an operating mode according to the results of control supervision. For providing of conditions of a mode heat and humidity processing, it is recommended to the Customer to organize hotbed designs or stationary tunnel chambers.
At the expiration of the strength ensembling period the demountable curb is disassembled, the pallet with the massif moves to a cutting section. The curb is cleaned, assembled, oiled, and installed on the free pallet and moves to filling under ÄÑÊ.
The massif, which has gained necessary plastic strength, is captured by the special positional conveyor and moves for cutting. At the first stage by means of screw milling cutter the top is sheared off the massif (up to 5 mm). At the second and third stage cross and longitudinal massif cutting occurs. After that the massif cut into blocks is rolled to a pushing conveyor for submission into chambers of heat and humidity processing. There is an experience of the tested variant of the arrangement of such chambers as “thermos” with use of exothermal effect of reaction of cement hydration.
If the Customer uses sand or large screening as fillers, there is a probability of pilling of material with subsidence of larger particles on the massif bottom that can result massif undercut. In this case in the wooden basis of the pallet technological flutes are slitted for passing of cutting strings up to the metal skeleton.

After the stage of heat and humidity processing, the cut massif is rolled out on the carriage on disassembly. Blocks are stacked on shipping pallets, pulled together with a fastening-tape and with the help of transporting mechanisms move to warehouse platform or to warehouse. The further curing period of finished blocks at positive temperature is determined by the Customer and makes from one to two weeks. The released pallet is cleaned, interlaid with layer or with oiled paper and brought into filling zone.

Specification

¹ Name Price rub.
(incl. VAT)
Image
1 Construction site of aerated concrete mix preparation 0
insrease
combined screw feeding units; 0
Dosing unit component; 0
mixer component; 0
Water conditioning component (ÑÄÆÊ – 3ï); 0
automatic control system; 0
frames, flight of steps, curb. 3340000
2 Mechanized construction site of interorbital transportation: 0
insrease
positional transporters (4 items); 0
pusher transporter (3 items); 0
overrunning carts (3items). 1056000
3 Ó÷àñòîê ïîðåçêè áëîêîâ: 0
insrease
Ðèô-1 1200000
4 Construction site of form mounting Ðèô-1; 0
insrease
handling dolly – 135 items 1147500
movable curb – 45 items 270000
5 Consumed cement silo 350000
insrease
6 Consumed filler’s silo 350000
insrease
Èòîãî: 9016200

Total: price of the plant, without custom registration and chief mounting:,
assembled with ÓÐÊ-3Ì – 7.326.000 rubles.
assembled with “ÐÈÔ-1” – 7.713.500 rubles.

Commercial conditions
Pricing: from a warehouse in Russia, Kaluga, not including price of customs registration and installation.
Terms of shipment: about 4 months from the moment of receipt of advance payment and the solving of all technical questions.
Payment: advance payment at the rate of 80 %, the rest of 20 % at the moment of availability of the equipment for shipment.

Chief mounting and putting into operation

The result of chief mounting and putting of the equipment into operation is considered to be “dry” trial start, commissioning and training of the Customer’s staff, manufacture of a trial lot of products with volumetric density of 600 kg / m3.
The density of 500êã/m3 is mastered after the certain term of operation, at the achievement of necessary professional skills of the staff and optimization of a mix structure by the Customer in his premises.
The same is for density of 400êã/m3 if quality of used materials allows.
Before putting of the equipment into operation the Customer should provide necessary raw material on the industrial platform.
By the moment of experts arrival for carrying out of chief mounting and putting of the equipment into operation it is very important that all the foundations are ready and fit the set sizes. The supply of a current and water should be carried out. It is necessary to have load-lifting mechanisms. All works on preparation of the premises and installation of auxiliaries should be finished. Works on preparation of a premise, assembling and installation of railway lines, filling of foundation and other building work are not related to installation. Those parts of the equipment which are provided by the Customer are not related to installation as well.
The staff which will operate the installation, should be on a platform during all term of installation and start-up of the equipment. The customer should provide electricians, mechanics and auxiliary staff for carrying out the installation works.
The customer additionally pays residence costs for specialists of Limited Company “ICC” in hotel, meals on the building site, transportation from hotel up to a place of installation and back, and also transport charges from Kaluga to a place of installation and back.

Technological works carried out by specialists of Limited Company “ICC”
The purpose, tasks, and initial data for execution phase:

Development of the documentation, training and improvement of the “know-how” of walling blocks of non-steam cured manufacture on line ÏÁÇ – 120À

Stages:
1. Development of offers by way of preparation of raw material.
2. Development of the technological, industrial and auxiliary documentation.
3. Improvement of the walling blocks “know-how” of non-steam cured foam concrete with density mark: D500, D600, D700, training of the working staff on line ÏÁÇ – 120À and acceptance of the executed work.

The basic requirements to results:
Technological process should provide manufacture of walling blocks non-steam cured foam concrete with technical characteristics, satisfying requirements of GOST 21520-89 and GOST 25485-89 by indicators of average density mark and a class of strength compression.

The list of the documentation presented after completion of works:
1. Offers on technological ways of preparation of walling materials.
2. Production schedules for designing of fine walling blocks manufacture on line ÏÁÇ – 120À with application of local raw materials.
3. Chart of technological process of manufacture.
4. Industrial instructions on worksite (dosing specialist, the carver, mill specialist the packer).
5. Blank forms for journal conducting (the entrance inspection, the current inspection, the outgoing inspection, log-books at worksite of dosing specialist, the carver, the mill specialist).
6. Selection of GOST and building regulations activities.
7. List of the necessary equipment for laboratory with addresses of suppliers.
8. Samples of the passport on finished goods.
9. Samples of documents on carrying out of inspection of the enterprise for certification of production.
10. Samples of documents for reception of sanitary – hygienic conclusion concerning manufacture environment.
The documentation is transferred in a printed form or on the electronic carrier in one copy.
Requirements on security:
The documentation and the information received while “know-how” adjustment and training of the technologist cannot be transferred to unauthorized persons.

Wiring and putting the electric equipment into operation
By the moment of wiring all parts of the equipment should be correctly installed, cable channels are ready and cleaned. All distributive cases should be installed. Input of the electric equipment is possible only at above-zero temperature in workshop (more than +5° Ñ).
For the period of carrying out of installation works and start-up of electric equipment the Customer is obliged to provide the electrician serving the installation in future and technical support staff..

Specifications
The necessary recipe of aerated concrete mixes is defined by the Supplier while putting the equipment into operation not on a basis of the analysis of test samples of a material provided by the Customer. The Customer carries out optimization of a compounding of a mix independently during manufacture on the basis of laboratory analyses and supervision. Specialists of Limited Company ” ICC ” render the advisory technological assistance for all period of operation of the equipment.

General conditions

The present commercial offer is based on standard conditions of Limited Company “ICC” on delivery, shipment, chief mounting and acceptance of the equipment in operation.
Machines and parts of installations are produced according to the Russian standards and instructions of the legislation.
The parts of installations which are not included into standard deliveries of Limited Company “ICC”, but belonging to standard equipping of Limited Company “ICC”, should meet technical standards for maintenance of faultless following operation of all installation as a whole. The guarantee of the given company is not applied to integral, but not produced by Limited Company “ICC” components. Limited Company “ICC” does not guarantee technical characteristics of such components.
Building of all foundations is carried out by the Customer on the basis of the circuits of placing of the equipment coordinated with Limited Company “ICC”. For inadequate building of foundations Limited Company “ICC” does not bear the responsibility.
Noise insulations and acoustic protection devices, dustproof filters, etc. are not included into standard delivery if they are not declared in the specification additionally.
The equipment is delivered without the device of compressed air supply, the appropriate supply with the compressed air is provided with the Customer. All data concerning supply by the compressed air is provided by Limited Company “ICC” after placement of the order. The water heating devices delivered in standard complete set ÏÁÇ-120 À, are designed for maintenance of the set temperature. For maintenance of necessary productivity the temperature of supplied water should be not less than +10° C.
Any claims, in particular, connected with consumption of losses of any kind, including those, not connected with standard delivery volume or with the stipulated guarantee certificates are excluded. In particular, Limited Company “ICC” does not bear the responsibility for the missed benefit or the half-received profit.
Operation manuals are issued in Russian. All translations into other languages can be provided at additional expense.
The engineering data specified in the offer such as, for example, capacity, the charge of a current, air and water, are approximate, but not guaranteed and should be stipulated while placing the order.
Observance of all instructions concerning the safety precautions and other local normative documents is assigned to the Customer.
Regarding purchasing of equipment contact marketing department
ÎÎÎ «Incorporated Industrial Company»
Russia, city Kaluga, Svetlaya St., 37

Tel. +7 4842 70 02 52,
+7 4842 70-04-92

buy active instagram followers buy facebook subscribers orlando seo